How long does the installation take?

It may take up to a day to complete the installation of the nbn™ Utility Box (PCD).  However you do not need to be home when the work is carried out, unless you have a locked gate or an obstruction such as a large dog.  In that case, please let us know prior to the scheduled installation date on 1800 687 626.

This information applies to FTTP (fibre to the premise technology).  The  information relevant to the technology being rolled out to your area will be provided when the nbn™ network is available at your address. Check your address to be notified when you can connect your home or business to the nbn™ network.